A technology company wanted three days of working sessions for its people, run as an unconference where attendees book their own rooms and the agenda changes daily. Confidentiality shaped most of the plan. No company name or logo appeared anywhere a non-employee could see it, and our team stayed out of the sessions themselves.
Size was the other constraint. The group started out fitting in one hotel and grew to roughly 550 guests, so the program ended up split across a main resort and two overflow hotels nearby.
We ran the rooming list for all three properties. Overflow placement followed a simple rule the client agreed to up front: seniority, and how late someone joined the list. That gave us a clear answer for anyone who asked why they were at an overflow hotel, and one person to route questions to. Shoulder nights, spouses and families, accessibility needs and late additions all went through the same attendee record, so the hotels got one consolidated list instead of a dozen emails.
Most people arrived by bus in waves of about 50, each leaving five to ten minutes apart. We set up arrival so nobody waited in one long line:
Bell staff met each bus and tagged bags in one of three colors, one per hotel, so luggage for the overflow hotels never got mixed into the main resort's storage.
Attendees checked in with us first, by QR code or by name with ID. The scan showed each person's dietary flags and jacket size, so they left with a badge and the right jacket in one stop.
Then they went to the hotel desk, left a phone number and got a text when their room was ready.
Lunch ran from 11:30 to 2:30, so people could eat first or check in first depending on how hungry they were. When the forecast turned, we made the rain call early and moved lunch indoors.
Shuttles looped between the three hotels from 4 to 6 pm, and from 7:30 am to midnight on the full day.
The client bought out the entire conference center and allocated rooms internally. Our job was to make the building work without being in the rooms. AV crews waited outside the general session and came in only if called, and hotel staff refreshed coffee only between sensitive segments. Because the schedule changed every day, signage was tied to locations rather than sessions: swappable breakout signs, floor decals, a health station, overflow shuttle signs, luggage storage and departure buses by destination. We cut the recording package and decorative lighting from the AV order entirely, since nobody needed them.
The client brought its own security team. Everyone in the conference center wore a badge and lanyard, including security, AV, our staff and even the espresso-cart baristas. The team's working room stayed unlocked so people could drop in, and a guard was posted at the door instead. Our onsite staffing partner signed NDAs and worked as part of the Nowadays team, all in black.
Night one was a full buyout of a landmark local venue for a strolling dinner. Shuttles left each hotel at 6:15, with extra departures from the main resort at 6:30 and 6:45. The venue had one way in and one security check at the door, so we set up a badge desk on site for anyone who had gone straight to their hotel. Return shuttles looped from 8 to 11 pm, and someone from our team stayed until the last one left.
This group cares about good coffee, so there were espresso carts on both floors. We ordered 650 jackets in two colors and two cuts, sized from what people gave in their RSVP. There were postcards, too, and box lunches on the last day were allocated by dietary need. We also had a dedicated wifi network set up at the hotel's maximum capacity. When it needed reconfiguring mid-session, we posted the 15-minute outage window in the announcements channel before it happened and had IT help stationed outside the working room.
We asked everyone at the overflow hotels to check out before the final session and bring their bags, so nobody had to double back. Buses left at 11:45, 12:00 and 12:15, with a last-call bus at 12:30. Movers arrived at 1 pm for the client's equipment.
From the client's post-event survey:
4.74 / 5 for arrival and check-in, with every response a 4 or a 5
4.56 / 5 for the Nowadays site and help channel
4.55 / 5 for shuttles and coaches
Beyond the survey, 535+ attendees received calendar invites for all four program moments, and the same team is now planning its next offsite with us.
The survey also told us what to fix. One coach on the welcome-night route had weak air conditioning, and a few people found the jackets stiff. Both are on the checklist for next time.